ORMISTON ROAD

Client: Ji Xiang Garden Development Ltd
Location: Flat Bush, Auckland
Year: 2016

Developed in four stages, this 103-lot residential project involved intensive earthworks and lime stabilisation to create a platform suitable for land development. This included drainage, water mains, utility reticulation, roading, retaining walls and a storm water retention pond. Late supply of accurate geotechnical information left the developers facing unforeseen ground conditions that dramatically changed the project parameters.

Our understanding of roading subgrades and other civil construction requirements, coupled with our ability to ‘react on the fly’ during this critical time, facilitated the project’s success. We were able to accurately define the out-turn cost, and programme, for the funder and the client.

Roles & Responsibilities:

White Associated provided bank funding representation with an initial report on project feasibility and monthly drawdown certifications.